Asphalt Paving in Oklahoma

Call Us Today

(405) 800-7166

Oklahoma Asphalt Paving Done Right — From Sub-Base to Surface


Asphalt paving is not simply placing hot-mix material over the ground. The long-term performance of any asphalt surface — whether a residential driveway or a 200-stall commercial parking lot — is determined primarily by what happens before a single ton of asphalt is placed: sub-grade preparation, base depth, compaction, and drainage engineering.

At 633 Asphalt & Construction LLC, every paving project begins with a thorough site assessment. We evaluate existing soil conditions, traffic load requirements, drainage patterns, and depth specifications to engineer the correct structural section for your property. We then prepare the sub-grade, place and compact a granular base layer of the specified depth, and install hot-mix asphalt to the required thickness using commercial paving equipment.

The result is a pavement system that handles Oklahoma’s extreme temperature swings — from summer surface temperatures above 140°F to winter freeze-thaw cycles — and delivers a smooth, durable surface that carries your property’s value for 20–30 years with proper maintenance. Learn more about pavement design standards at the Asphalt Institute.

Every project — regardless of size — is treated with the same level of care, precision, and accountability that has made 633 Asphalt the trusted name in Oklahoma paving. Owner Guillermo Zuniga personally walks every completed project to ensure it meets the 100% Satisfaction Guarantee.

We serve 15+ Oklahoma communities from our Guthrie headquarters, with commercial capabilities for projects averaging $100,000–$1,000,000 in contract value, verified on the Procore contractor network.

$1.50-$7

PER SQUARE FOOT

Typical installed cost range, residential through commercial. Free estimates always available.


24-48 Hours

OPEN TO TRAFFIC

New asphalt surfaces are ready for passenger vehicle use within one to two days of installation.


20–30 Years

EXPECTED LIFESPAN

With sealcoating every 3–5 years and prompt crack repair, asphalt surfaces regularly exceed 25 years.

Asphalt Paving by 633 Asphalt & Construction LLC

Asphalt Paving Services We Provide


633 Asphalt handles every type of asphalt paving project — from small residential driveways to large-scale commercial reconstructions. Here's a breakdown of the paving scopes we deliver.

Residential Driveway Paving

New driveway installation, replacement of deteriorated concrete or gravel surfaces, and driveway extensions for single-family homes and residential properties. We size the base depth and asphalt thickness for residential vehicle loads.

Typical: 2–4 inch surface course · 4–8 inch aggregate base

Commercial Parking Lot Paving

New parking lot construction and full reconstruction for retail centers, office parks, warehouses, churches, and municipal properties. Includes grading, drainage, curb and gutter work, and line-of-sight compliance.

Typical: 3–4 inch surface · 6–12 inch compacted base

Asphalt Overlay (Mill & Overlay)

Where the existing base structure is sound, we mill off 1.5–2 inches of deteriorated surface and replace with fresh hot-mix asphalt — restoring ride quality and waterproofing at significantly lower cost than full reconstruction.

Best for: aged surfaces with intact base · saves 30–50% vs. full replacement

Full-Depth Reclamation & Reconstruction

When the base or sub-grade has failed, we remove existing pavement, re-grade and compact the sub-base, install a new aggregate base layer, and build the asphalt structure from scratch — the only lasting solution for base failure.

Required when: alligator cracking, base failure, severe drainage issues

Private Road & Access Drive Paving

Paving of private roads, apartment complex access drives, industrial facility roadways, and rural property roads. We design for the anticipated vehicle weight — including semi-trucks, RVs, or farm equipment when needed.

Heavy vehicle: 4–6 inch surface · 8–12 inch engineered base

Sub-Base & Base Course Installation

Standalone base course work for projects requiring earthwork, grading, and aggregate base preparation before any surface paving. Includes compaction testing, drainage swale installation, and ADA-compliant slope grading.

Part of every new paving project — also available as standalone scope

Our Asphalt Paving Process


Every 633 Asphalt paving project follows a structured, proven installation sequence. No shortcuts, no skipped steps — because the quality of new pavement is built into the process, not applied at the end.

1. Free On-Site Assessment & Estimate

We visit your property at no charge to evaluate existing conditions — soil type, drainage, current surface state, and access — and discuss your project goals. We then provide a detailed written proposal with no obligation to proceed.

⏱ Typically scheduled within 1–3 business days

Existing pavement or surface material is removed and hauled off-site. The sub-grade is excavated to the depth required for the engineered base section. Tree roots, organic material, and unstable soils are addressed at this stage.

⏱ 1–2 days depending on project size

The exposed sub-grade is graded to establish positive drainage — water must flow away from structures and off the pavement surface. We achieve a minimum 1–2% cross-slope. Soft or unstable areas are stabilized with geotextile fabric or additional base material.

⏱ Critical phase — determines long-term drainage performance

Crushed stone aggregate base (typically 3/4-inch clean stone or crusher run) is placed in lifts and mechanically compacted using a vibratory roller to the specified depth. Compaction density is verified before asphalt placement begins.

⏱ Base depth: 4–12 inches depending on traffic load design

A thin asphalt emulsion tack coat is applied to all bonding surfaces — existing pavement edges, concrete interfaces, and any multi-lift asphalt layers — to create a chemically bonded interface between the base and the new surface course, preventing delamination.

⏱ Applied immediately before asphalt placement

Hot-mix asphalt (HMA) is delivered at temperatures between 275–325°F and placed using a commercial asphalt paver to a uniform mat depth. The material is then steel-drum rolled and pneumatic-roller compacted to achieve design density before the mix cools below 185°F.

⏱ Asphalt surface: 2–6 inches depending on application type

All pavement edges are hand-finished to a consistent bevel, transition joints to existing surfaces are feathered smooth, and the site is cleaned of all debris, excess material, and equipment marks. Temporary traffic control measures are removed.

⏱ Open to traffic 24–48 hours after final rolling

Guillermo personally walks the completed project with you to verify every aspect of the work — surface smoothness, edge quality, drainage flow, and transitions. Our 100% Satisfaction Guarantee means we address any concern before the project is closed out.

⏱ No project is complete until you're satisfied

Ready to Pave?

Let's Get Started.

Get a free, no-pressure on-site estimate from Oklahoma's trusted asphalt paving contractor. We'll assess your property, explain your options honestly, and give you a detailed written proposal — usually within 1–3 business days.